Menu
Sign In Pricing Add Podcast

Acquired

TSMC (Remastered)

1892.955 - 1913.597 David Rosenthal

fabrication perspective is you want to have a ton of volume from the get-go. As soon as the plan is online, you want to be running at max capacity so that you can, A, learn as fast as possible, get yields up to the profitable levels, and then you want to still be running at max capacity as long as possible because you already spent the fixed cost to make the plan.

0
💬 0

Comments

There are no comments yet.

Log in to comment.